top of page
Balancing Rock Trail


Wet Boots, Good Roots: Upper Balancing Rock Trail Work Bee Re-cap.
On Sunday, April 12, thirteen volunteers laced up their boots and headed into the hills — mist, drizzle, and all. Conditions on the upper Balancing Rock / Creston Mountain Trail were what some would generously call refreshing and others might simply call wet. Either way, the crew didn't flinch. From Skunk Cabbage Swamp to trail end, the work got done, and everyone made it home in one piece. It was a long day on the trail — exactly the kind that reminds us why this work matter
Apr 131 min read


Balancing Rock | Boardwalk Replacement — Project Update Spring 2026 | Trail Improvement
Spring is arriving, and so is one of our most exciting projects for 2026. This season, we're replacing the deteriorating boardwalk in the wetland area on the Balancing Rock Trail— and we're doing it right. The old structure has long reached the end of its life, and in its place, we'll be installing a floating dock-style boardwalk that will be more durable, more functional, and better suited to the dynamic wetland environment it crosses. We're proud to share that this project
Apr 22 min read


Balancing Rock Work Bee – Trail Cleared & Spirits High!
Sunday’s Balancing Rock Trail Work Bee was a resounding success — thanks to 10 incredible volunteers who showed up early, stayed...
May 27, 20251 min read


Balancing Rock Trail
Directions The trailhead is well marked and found just a short distance, 150m south, from Highway 3 on West Creston Rd. There is a...
Apr 7, 20251 min read
bottom of page
