Since February, much work has been done on the Old Ferry Landing site as the Trail Society, along with the support of local businesses, develop it into a recreation site for residents and visitors of the Creston Valley to use and enjoy.

After a few clean-up sessions, the site was prepared with proper drainage using an excavator and gravel was laid down for the turn-around/parking area. Many thanks to Ja-co Industrial Ltd. for the excavator and to Sullivan Stone for the gravel.

site excavation

during_gravel

after_gravel

Six picnic table sites have been prepared for the concrete that will be poured and will support the six picnic tables that are still in the process of being acquired. Many thanks to Home Hardware and Pyramid Building Supplies for their support.

picnic_table_sites